Java method for judging the difference in days between two dates
•
Java
This article describes the method of Java to judge the number of days difference between two dates. Share with you for your reference. The details are as follows:
The above code is used in the project. It takes 24 hours to calculate a day. It is not suitable for the needs of the project, so it is changed to this way.
I hope this article will be helpful to your Java programming.
The content of this article comes from the network collection of netizens. It is used as a learning reference. The copyright belongs to the original author.
THE END
二维码